In 1989 London Underground
commissioned Creactive to provide interior designs to upgrade their
Circle Line Rolling Stock that would meet the latest fire specifications,
increase passenger density and improve the passenger environment.
Creactive undertook a programme of work that included drawings, visuals,
scale models and a full-size seating bay mock-up.
Creactive then went on to produce a tender document with detail drawings
defining the interior layout, seat design and general details, along
with colour specifications and finishes.
The programme of work was completed in nine weeks.